🔴 LIVE  |  Purvanchal Expressway: 95% complete  •  Delhi-Mumbai IE: Package 14 awarded ₹2,100 Cr  •  Ganga Expressway: Phase 2 begins
Expressway91
← All Expressways
● OperationalMSRDC

Mumbai–Nagpur Expressway

Mumbai → Nagpur

100%
Complete
701 km
Total Length
701 km
Completed
₹— Cr
Project Cost
1
States
—
Districts
—
Industrial Nodes
6-lane
Configuration

Project Overview

The Mumbai–Nagpur Expressway Expressway runs from Mumbai to Nagpur. It spans 701 km with 6 lanes (Intra-state). The corridor passes through Maharashtra. Current status: Operational.

Specifications

Authority MSRDC
Start Point Mumbai
End Point Nagpur
Total Length 701 km
Lanes 6
Target Completion Completed 5 June 2025
Cost ₹— Cr

Construction Progress

Package data not yet available.

Investment Intelligence

₹— Cr
Total Investment
3.2x
Land Value Multiplier
2024–2027
Investment Window

Related News

Top 10 Benefits of the Mumbai–Nagpur Expressway
Aug 10, 2026

Top 10 Benefits of the Mumbai–Nagpur Expressway

Top 10 Benefits of the Mumbai–Nagpur Expressway Top 10 Benefits of the Mumbai–Nagpur Expressway The Mumbai–Nagpur Expressway is poised to transform travel and logistics across…

Route Information

Route details: Mumbai → Nagpur, covering 1 states and — districts over 701 km.