🔴 LIVE  |  Purvanchal Expressway: 95% complete  •  Delhi-Mumbai IE: Package 14 awarded ₹2,100 Cr  •  Ganga Expressway: Phase 2 begins
Expressway91
← All Expressways
● OperationalNHAI

Sohna Elevated Corridor

Gurgaon , Sohna → —

100%
Complete
21.65 km
Total Length
21.65 km
Completed
₹— Cr
Project Cost
1
States
Districts
Industrial Nodes
6-lane
Configuration

Project Overview

It spans 21.65 km with 6 lanes (Urban). The corridor passes through Haryana. Current status: Operational.

Specifications

Authority NHAI
Start Point Gurgaon , Sohna
End Point
Total Length 21.65 km
Lanes 6
Target Completion Completed 2022
Cost ₹— Cr

Construction Progress

Package data not yet available.

Investment Intelligence

₹— Cr
Total Investment
3.2x
Land Value Multiplier
2024–2027
Investment Window

Related News

Route Information

Route details: Gurgaon , Sohna → —, covering 1 states and — districts over 21.65 km.