🔴 LIVE  |  Purvanchal Expressway: 95% complete  •  Delhi-Mumbai IE: Package 14 awarded ₹2,100 Cr  •  Ganga Expressway: Phase 2 begins
expressway91.com
← All Expressways
● OperationalUPEIDA

Purvanchal Expressway

Lucknow (Chandra Shekhar Azad Agricultural University) → Ghazipur (Haidaria)

100%
Complete
341 km
Total Length
341 km
Completed
₹22496 Cr
Project Cost
1
States
9
Districts
12
Industrial Nodes
6-lane
Configuration

Project Overview

The Purvanchal Expressway is a 341 km, 6-lane access-controlled expressway connecting Lucknow to Ghazipur in eastern Uttar Pradesh. It is one of the landmark infrastructure projects of the Yogi Adityanath government, inaugurated in November 2021 by Prime Minister Narendra Modi.

The expressway passes through 9 districts of eastern UP — Lucknow, Barabanki, Amethi, Sultanpur, Ayodhya, Ambedkar Nagar, Azamgarh, Mau, and Ghazipur — transforming connectivity in the historically under-served Purvanchal region.

An airstrip built into the expressway in Sultanpur district allows Indian Air Force aircraft to land for emergency operations, making it strategically significant.

Specifications

Authority UPEIDA
Start Point Lucknow (Chandra Shekhar Azad Agricultural University)
End Point Ghazipur (Haidaria)
Total Length 341 km
Lanes 6
Target Completion Completed Nov 2021
Cost ₹22496 Cr

Construction Progress

Package data not yet available.

Investment Intelligence

₹22496 Cr
Total Investment
3.2x
Land Value Multiplier
2024–2027
Investment Window

Related News

No news articles yet.

Route Information

Route details: Lucknow (Chandra Shekhar Azad Agricultural University) → Ghazipur (Haidaria), covering 1 states and 9 districts over 341 km.