🔴 LIVE  |  Purvanchal Expressway: 95% complete  •  Delhi-Mumbai IE: Package 14 awarded ₹2,100 Cr  •  Ganga Expressway: Phase 2 begins
Expressway91
← All Expressways
⚡ Under ConstructionNHAI

Khammam–Devarapalli Expressway

Khammam → Devarapalle

0%
Complete
162.1 km
Total Length
— km
Completed
₹— Cr
Project Cost
2
States
Districts
Industrial Nodes
6-lane
Configuration

Project Overview

The Khammam–Devarapalli Expressway Expressway runs from Khammam to Devarapalle. It spans 162.1 km with 6 lanes (Inter-state). The corridor passes through Telangana, Andhra Pradesh. Current status: Under Construction.

Specifications

Authority NHAI
Start Point Khammam
End Point Devarapalle
Total Length 162.1 km
Lanes 6
Target Completion TBD
Cost ₹— Cr

Construction Progress

Package data not yet available.

Investment Intelligence

₹— Cr
Total Investment
3.2x
Land Value Multiplier
2024–2027
Investment Window

Related News

Route Information

Route details: Khammam → Devarapalle, covering 2 states and — districts over 162.1 km.