🔴 LIVE  |  Purvanchal Expressway: 95% complete  •  Delhi-Mumbai IE: Package 14 awarded ₹2,100 Cr  •  Ganga Expressway: Phase 2 begins
Expressway91
← All Expressways
⚡ Under ConstructionNHAI

Awadh (Kanpur–Lucknow)

Azad Chauraha, Kanpur → Shaheed Path, Lucknow

0%
Complete
62.76 km
Total Length
— km
Completed
₹— Cr
Project Cost
1
States
Districts
Industrial Nodes
6-lane
Configuration

Project Overview

The Awadh (Kanpur–Lucknow) Expressway runs from Azad Chauraha, Kanpur to Shaheed Path, Lucknow. It spans 62.76 km with 6 lanes (Intrastate). The corridor passes through Uttar Pradesh. Current status: Under Construction.

Specifications

Authority NHAI
Start Point Azad Chauraha, Kanpur
End Point Shaheed Path, Lucknow
Total Length 62.76 km
Lanes 6
Target Completion 2026
Cost ₹— Cr

Construction Progress

Package data not yet available.

Investment Intelligence

₹— Cr
Total Investment
3.2x
Land Value Multiplier
2024–2027
Investment Window

Related News

Route Information

Route details: Azad Chauraha, Kanpur → Shaheed Path, Lucknow, covering 1 states and — districts over 62.76 km.