🔴 LIVE  |  Purvanchal Expressway: 95% complete  •  Delhi-Mumbai IE: Package 14 awarded ₹2,100 Cr  •  Ganga Expressway: Phase 2 begins
Expressway91
← All Expressways
⚡ Under ConstructionNHAI

Bengaluru–Chennai

Hosakote → Sriperumbudur

39%
Complete
258 km
Total Length
100 km
Completed
₹— Cr
Project Cost
3
States
Districts
Industrial Nodes
4-lane
Configuration

Project Overview

The Bengaluru–Chennai Expressway runs from Hosakote to Sriperumbudur. It spans 258 km with 4 lanes (Inter-state — Partially opened). The corridor passes through Karnataka, Andhra Pradesh, Tamil Nadu. Current status: Under Construction.

Specifications

Authority NHAI
Start Point Hosakote
End Point Sriperumbudur
Total Length 258 km
Lanes 4
Target Completion 1 June 2026
Cost ₹— Cr

Construction Progress

Package data not yet available.

Investment Intelligence

₹— Cr
Total Investment
3.2x
Land Value Multiplier
2024–2027
Investment Window

Related News

No news articles yet.

Route Information

Route details: Hosakote → Sriperumbudur, covering 3 states and — districts over 258 km.